Download

Rapid Boom Recovery Unit

The Rapid Boom Recovery Unit is an innovative ancillary device designed to recover foam filled oil boom (FOB) at a high recovery rate . The recovery unit utilizes a hydraulic driven recovery system and pressurized guiding rails to recover deployed boom onto a vessel or a work platform. The rate of recovery is adjusted to the speed of the operation at hand by a hydraulic potentiometer allowing the boom to be quickly recovered onto the work platform or methodically straight onto a storage rack.

Made from aluminum the lightweight frame is installed to the work platform. Boom is feed through the guiding rails which apply horizontal pressure to hold the boom vertically in place. Water is drained from the boom as it is recovered. Two hydraulic motors work in unison to recover the boom through three directional rollers onto the work platform and are controlled by a one directional lever allowing quick stop and go of the boom during recovery operations.

The recovery unit is built to increase the efficiency of FOB recovery operations while maintaining safety. The system can be installed own any work platform as a removable system and its compact design means minimal storage space.

Gallery

 

Technical Specifications

Length 1200 mm
Width 700 mm
Height 1600 mm
Weight 163 kg
Hydraulic flow 5-10 l/min
Hydraulic pressure 70 bar

Features and Benefits

Compact design, light weight
Robust and seawater resistant
Rapid FOB boom recovery
Easy to use controls
Stop and go recovery
Drains water from boom
Easy installation
Compact storage

en_US
uk en_US